DSpace logo
Por favor, use este identificador para citar o enlazar este ítem: http://repositorio.ucsg.edu.ec/handle/3317/24537
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorBohórquez Escobar, Celso Bayardo-
dc.contributor.authorLapo Balladares, Matthew Rolando-
dc.date.accessioned2025-04-21T17:57:24Z-
dc.date.available2025-04-21T17:57:24Z-
dc.date.issued2024-09-04-
dc.identifier.urihttp://repositorio.ucsg.edu.ec/handle/3317/24537-
dc.descriptionLa subestación eléctrica Guayaquil ubicada en el km 23 via la costa distribuye energía a la Estación Terrena CNT EP., la subestación de 8/10MVA 69 kV/13.8 kV línea – línea, ha presentado inconsistencias en la facturación eléctrica, mostrando valores muy elevados en función a un consumo estimado, Donde en un diagnóstico de las instalaciones se detectaron inconsistencias entre los equipos mostrados en el diagrama unifilar y los que realmente estaban instalados en la subestación, revelando que la subestación estaba sobredimensionada en un 90% respecto a la carga actual del sistema por tal motivo fue necesario realizar un rediseño donde se determinó que es necesario implementar un juego de transformadores de corriente con relación 200/100/50:5 y un transformador de corriente tipo interior con relación 500/300/30:5 para habilitar la protección diferencial y asegurar una medición precisa de la corriente, presentando un presupuesto estimado para el proyecto es de 55,410.00 dólares.en_US
dc.description.abstractThe Guayaquil electrical substation located at km 23 via the coast distributes energy to the CNT EP Earth Station. The 8/10MVA 69 kV/13.8 kV line-line substation has presented inconsistencies in electrical billing, showing very high values in function to an estimated consumption, where in a diagnosis of the facilities inconsistencies are detected between the equipment shown in the one-line diagram and those that were actually installed in the substation, revealing that the substation was oversized by 90% with respect to the current load of the system, for this reason it was necessary to carry out a redesign where it is realized that it is necessary to implement a set of current transformers with a 200/100/50:5 ratio and an indoor type current transformer with a 500/300/30:5 ratio to enable the differential protection and ensure accurate current measurement, presenting an estimated budget for the project is $55,410.00.en_US
dc.formatapplication/pdfen_US
dc.language.isospaen_US
dc.publisherUniversidad Católica de Santiago de Guayaquilen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.rights.urihttp://creativecommons.org/licenses/by-nc-sa/4.0/en_US
dc.subjectDISTRIBUCIÓN ENERGÉTICAen_US
dc.subjectSUBESTACIÓN ELÉCTRICAen_US
dc.subjectPROTECCIÓN ELÉCTRICAen_US
dc.subjectMEDICIÓN ELÉCTRICAen_US
dc.titleRediseño de una subestación eléctrica – estación terrena CNT – Guayaquil 8/10 MVA.en_US
dc.typeinfo:eu-repo/semantics/bachelorThesisen_US
Aparece en las colecciones: Trabajos de Titulación - Carrera de Ingeniería en Electricidad

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
UCSG-C432-24171.pdf5,62 MBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons