Por favor, use este identificador para citar o enlazar este ítem:
http://repositorio.ucsg.edu.ec/handle/3317/24537
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Bohórquez Escobar, Celso Bayardo | - |
dc.contributor.author | Lapo Balladares, Matthew Rolando | - |
dc.date.accessioned | 2025-04-21T17:57:24Z | - |
dc.date.available | 2025-04-21T17:57:24Z | - |
dc.date.issued | 2024-09-04 | - |
dc.identifier.uri | http://repositorio.ucsg.edu.ec/handle/3317/24537 | - |
dc.description | La subestación eléctrica Guayaquil ubicada en el km 23 via la costa distribuye energía a la Estación Terrena CNT EP., la subestación de 8/10MVA 69 kV/13.8 kV línea – línea, ha presentado inconsistencias en la facturación eléctrica, mostrando valores muy elevados en función a un consumo estimado, Donde en un diagnóstico de las instalaciones se detectaron inconsistencias entre los equipos mostrados en el diagrama unifilar y los que realmente estaban instalados en la subestación, revelando que la subestación estaba sobredimensionada en un 90% respecto a la carga actual del sistema por tal motivo fue necesario realizar un rediseño donde se determinó que es necesario implementar un juego de transformadores de corriente con relación 200/100/50:5 y un transformador de corriente tipo interior con relación 500/300/30:5 para habilitar la protección diferencial y asegurar una medición precisa de la corriente, presentando un presupuesto estimado para el proyecto es de 55,410.00 dólares. | en_US |
dc.description.abstract | The Guayaquil electrical substation located at km 23 via the coast distributes energy to the CNT EP Earth Station. The 8/10MVA 69 kV/13.8 kV line-line substation has presented inconsistencies in electrical billing, showing very high values in function to an estimated consumption, where in a diagnosis of the facilities inconsistencies are detected between the equipment shown in the one-line diagram and those that were actually installed in the substation, revealing that the substation was oversized by 90% with respect to the current load of the system, for this reason it was necessary to carry out a redesign where it is realized that it is necessary to implement a set of current transformers with a 200/100/50:5 ratio and an indoor type current transformer with a 500/300/30:5 ratio to enable the differential protection and ensure accurate current measurement, presenting an estimated budget for the project is $55,410.00. | en_US |
dc.format | application/pdf | en_US |
dc.language.iso | spa | en_US |
dc.publisher | Universidad Católica de Santiago de Guayaquil | en_US |
dc.rights | info:eu-repo/semantics/openAccess | en_US |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-sa/4.0/ | en_US |
dc.subject | DISTRIBUCIÓN ENERGÉTICA | en_US |
dc.subject | SUBESTACIÓN ELÉCTRICA | en_US |
dc.subject | PROTECCIÓN ELÉCTRICA | en_US |
dc.subject | MEDICIÓN ELÉCTRICA | en_US |
dc.title | Rediseño de una subestación eléctrica – estación terrena CNT – Guayaquil 8/10 MVA. | en_US |
dc.type | info:eu-repo/semantics/bachelorThesis | en_US |
Aparece en las colecciones: | Trabajos de Titulación - Carrera de Ingeniería en Electricidad |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
UCSG-C432-24171.pdf | 5,62 MB | Adobe PDF | Visualizar/Abrir |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons