Por favor, use este identificador para citar o enlazar este ítem:
http://repositorio.ucsg.edu.ec/handle/3317/23485
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Hidalgo Aguilar, Jaime Rafael | - |
dc.contributor.author | Rivera Plúas, Jonathan Manuel | - |
dc.contributor.author | Cerna Vinueza, Carlos Raúl | - |
dc.date.accessioned | 2024-09-28T17:42:54Z | - |
dc.date.available | 2024-09-28T17:42:54Z | - |
dc.date.issued | 2024-02-14 | - |
dc.identifier.uri | http://repositorio.ucsg.edu.ec/handle/3317/23485 | - |
dc.description | La subestación nueva llamada Terminal Terrestre II acoge una tarea muy fundamental de entregar la energía eléctrica necesaria para el sector Sol Brisa del cantón Babahoyo, incluso de aliviar la carga que exige la demanda eléctrica para la actual subestación que abastece a cada usuario, con la finalidad de estabilizar el sistema interconectado de la ciudad de Babahoyo, mitigando posibles pérdidas o daños a futuro que económicamente representan un mal estar para la ciudadanía e incluso la misma empresa, el estudio determinará la viabilidad de contar con el proyecto de la mencionada subestación con la finalidad de estabilizar el sistema redistribuyendo el suministro actual específicamente los alimentadores Juan x Marcos, IESS y By-pass, así mismo solventar las necesidades energéticas de las nuevas cargas en proyecto por el dragado, aplicando la metodología necesaria en la investigación como recursos para argumentar y sustentar el contenido de este documento, que será el resultado esperado en el cumplimiento del objetivo general, de acuerdo a los cálculos realizados en validación del respectivo análisis con relación al sistema eléctrico de potencia (SEP), para que esto sea posible visualizar y tener un grado de confianza, se utiliza la herramienta ETAP 12.6.0 para comparar el funcionamiento de actual subestación y posterior a eso ambas con el arreglo que se plantea en este estudio, sin dejar de lado las debidas protecciones y sus equipos eléctricos, posterior a esto presentar el presupuesto estimado en el área eléctrica culminando al emitir las conclusiones y recomendaciones. | en_US |
dc.description.abstract | The new substation called Terminal Terrestre II hosts a very fundamental task of delivering the necessary electrical energy for the Sol Brisa sector of the Babahoyo canton, including alleviating the load required by the electrical demand for the current substation that supplies each user, with the purpose to stabilize the interconnected system of the city of Babahoyo, mitigating possible losses or damages in the future that economically represent a bad situation for the citizens and even the company itself, the study will determine the viability of having the aforementioned substation project with the purpose to stabilize the system by redistributing the current supply, specifically the Juan x Marcos, IESS and By pass feeders, as well as solving the energy needs of the new loads in the project due to dredging, applying the necessary methodology in the research as resources to argue and support the content of this document, which will be the expected result in compliance with the general objective, according to the calculations carried out in validation of the respective analysis in relation to the electrical power system (SEP), so that this is possible to visualize and have a degree trustworthy, the ETAP 12.6.0 tool is used to compare the operation of the current substation and after that both with the arrangement proposed in this study, without leaving aside the due protections and its electrical equipment, after this present the estimated budget in the electrical area culminating in issuing conclusions and recommendations | en_US |
dc.format | application/pdf | en_US |
dc.language.iso | spa | en_US |
dc.publisher | Universidad Católica de Santiago de Guayaquil | en_US |
dc.rights | info:eu-repo/semantics/openAccess | en_US |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-sa/4.0/ | en_US |
dc.subject | SUBESTACIÓN ELÉCTRICA | en_US |
dc.subject | ALIMENTADOR ELÉCTRICO | en_US |
dc.subject | ENERGÍA ELÉCTRICA | en_US |
dc.subject | DEMANDA ELÉCTRICA | en_US |
dc.title | Estudio para la implementación de una subestación eléctrica de transformación de 69Kv/13.8KV/120/240V, 24MVA en el sector Sol Brisa Cantón Babahoyo, Provincia Los Ríos. | en_US |
dc.type | info:eu-repo/semantics/bachelorThesis | en_US |
Aparece en las colecciones: | Trabajos de Titulación - Carrera de Ingeniería en Electricidad |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
UCSG-C432-22975.pdf | 3,48 MB | Adobe PDF | Visualizar/Abrir |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons