DSpace logo
Por favor, use este identificador para citar o enlazar este ítem: http://repositorio.ucsg.edu.ec/handle/3317/21660
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorGallardo Posligua, Jacinto Esteban-
dc.contributor.authorOrdoñez Márquez, Jorge Luis-
dc.date.accessioned2023-10-03T18:46:16Z-
dc.date.available2023-10-03T18:46:16Z-
dc.date.issued2023-02-15-
dc.identifier.urihttp://repositorio.ucsg.edu.ec/handle/3317/21660-
dc.descriptionEl presente trabajo de titulación aporta una solución a un problema que se venía presentando en la planta del horno de arco eléctrico ya que originalmente se trabajaba con un medidor de energía eléctrica antiguo, pero este estaba presentando averías y por momentos dejada de funcionar lo que ocasionaba paradas en la producción. La petición de la empresa fue habilitar un medidor de energía adicional al que estaba originalmente para poder tener un respaldo al momento de que llegase a fallar el medidor principal, para la habilitación del medidor adicional se rediseño la programación de varios controladores lógicos programables además de los sistemas de interfaz humano máquina para que los operadores del horno de arco eléctrico puedan tomar mediciones de la energía consumida, como conclusión después de haber realizado todo el trabajo se tuvo como resultado que las paradas de producción por falta de medición de energía se terminaron ya que se tuvo dos sistemas de medición completamente independientes el uno del otro que aseguraban tener una referencia constante de la energía que se está consumiendo.en_US
dc.description.abstractThe present degree work provides a solution to a problem that had been occurring in the electric arc furnace plant since originally an old electric energy meter was used but it was presenting breakdowns and at times it stopped working, which caused stoppages in the production. The company's request was to enable an additional energy meter to the one that was originally in order to have a backup when the main meter failed. To enable the additional meter, the programming of several programmable logic controllers was redesigned in addition to the human machine interface systems so that the operators of the electric arc furnace can take measurements of the energy consumed, as a conclusion after having carried out all the work, the result was that the production stops due to lack of energy measurement were finished since there were two completely independent measurement systems one from the other that ensured having a constant reference of the energy that is being consumed.en_US
dc.formatapplication/pdfen_US
dc.language.isospaen_US
dc.publisherUniversidad Católica de Santiago de Guayaquilen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.rights.urihttp://creativecommons.org/licenses/by-nc-sa/4.0/en_US
dc.subjectENERGÍA ELÉCTRICAen_US
dc.subjectMEDIDOR DE ENERGÍAen_US
dc.subjectINTERFAZ HUMANO MÁQUINAen_US
dc.subjectCONTROLADOR LÓGICO PROGRAMABLEen_US
dc.subjectCONSUMO ELÉCTRICOen_US
dc.titleDiseño de un sistema de medición de consumo de energía para el horno de arco eléctrico de la planta ANDEC S. A. en la ciudad de Guayaquil – provincia del Guayas – Ecuador.en_US
dc.typeinfo:eu-repo/semantics/bachelorThesisen_US
Aparece en las colecciones: Trabajos de Titulación - Carrera de Ingeniería en Electricidad

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
T-UCSG-PRE-TEC-IELE-15.pdf4,63 MBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons