Por favor, use este identificador para citar o enlazar este ítem:
http://repositorio.ucsg.edu.ec/handle/3317/20819
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Molina Arce, Stephenson Xavier | - |
dc.contributor.author | Paredes Tapia, Rubber Fabrizio | - |
dc.contributor.author | Toro Jaramillo, Steveen Medardo | - |
dc.date.accessioned | 2023-04-20T18:42:41Z | - |
dc.date.available | 2023-04-20T18:42:41Z | - |
dc.date.issued | 2023-02-17 | - |
dc.identifier.uri | http://repositorio.ucsg.edu.ec/handle/3317/20819 | - |
dc.description | En el presente trabajo de titulación se tiene como objetivo optimizar el plano de presiones de una RDAP para asegurar la mejora en la prestación del servicio desde el punto de vista de las presiones de servicio a los usuarios priorizando el uso eficiente del agua potabilizada para una zona de aproximadamente 813 cuentas de agua potable y 53 Km de red. Para esto se deberá realizar el tratamiento de los datos obtenidos en terreno para poder utilizados en las estimaciones de los componentes del balance hídrico previo a la renovación de redes, y actual; determinación de indicadores de pérdidas, análisis de datos, y recomendaciones. Los resultados demuestran que con el uso de válvulas reductoras de presión en las entradas o salidas de cada sector podemos reducir hasta en un 50% las presiones que pasan de los 55 mca, que es lo máximo permitido en la propuesta y que trabajen al menos hasta 10 mca que fue lo mínimo planteado. | en_US |
dc.description.abstract | In the present titling work, the objective is to optimize the pressure plane of a RDAP to ensure the improvement in the provision of the service from the point of view of service pressures to users, prioritizing the efficient use of potable water for an area. of approximately 813 drinking water accounts and 53 km of network. For this, the treatment of the data obtained in the field must be carried out in order to be used in the estimations of the components of the water balance prior to the renewal of networks, and currently; determination of loss indicators, data analysis, and recommendations. The results show that with the use of pressure reducing valves at the entrances or exits of each sector we can reduce by 50% the pressures that exceed 55 mca, which is the maximum allowed in the proposal and that they worked at least until 10 mca, which was the minimum raised. | en_US |
dc.format | application/pdf | en_US |
dc.language.iso | spa | en_US |
dc.publisher | Universidad Católica de Santiago de Guayaquil | en_US |
dc.rights | info:eu-repo/semantics/openAccess | en_US |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-sa/4.0/ | en_US |
dc.subject | ABASTECIMIENTO DE AGUA | en_US |
dc.subject | VÁLVULAS REDUCTORAS DE PRESIÓN | en_US |
dc.subject | TRATAMIENTO DE AGUA | en_US |
dc.subject | MODELOS HIDRÁULICOS | en_US |
dc.title | Propuesta de regulación de presiones en una sección de la red de distribución de agua potable (RDAP) del cantón Riobamba. Circuitos abastecidos desde el tanque de planta de tratamiento. | en_US |
dc.type | info:eu-repo/semantics/bachelorThesis | en_US |
Aparece en las colecciones: | Trabajos de Titulación - Carrera de Ingeniería Civil |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
T-UCSG-PRE-ING-IC-479.pdf | 2,46 MB | Adobe PDF | Visualizar/Abrir |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons